Power by county
Breckinridge, KY: data center power outlook
Breckinridge, Kentucky is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Breckinridge carries 13 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Breckinridge spans 9 utilities, with CITY OF TELL CITY - (IN), CITY OF TROY - (IN), DUKE ENERGY INDIANA, LLC among those mapped.
Grid position at a glance
- Serving utilities
- CITY OF TELL CITY - (IN), CITY OF TROY - (IN), DUKE ENERGY INDIANA, LLC, EAST KENTUCKY POWER COOP, INC, KENERGY CORP, MEADE COUNTY RURAL E C C, NOLIN RURAL ELECTRIC COOP CORP, SOUTHERN INDIANA R E C, INC, WARREN RURAL ELEC COOP CORP
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 345 kV
- Substations in county
- 13
- Industrial retail rate
- 7.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 9 serving utilities: 4.1 to 7.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 3 projects, 350 MW
- Proposed generation
- 300 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 2.9 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 65,618 employed in construction within ~120 km (45 of 49 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Breckinridge
The material below frames Breckinridge, Kentucky for a prospective large load, drawing only on public sources. Grid access in Breckinridge extends to 345 kV, a high-voltage line class. The mapped layer places 13 substations across Breckinridge, a moderate density.
Interconnection over Breckinridge runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Breckinridge, the rate shown is the state industrial average of 7.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Breckinridge that report an industrial rate span 4 of 9 serving utilities: 4.1 to 7.0¢/kWh, shown as context and never as the county rate.
The queue feeds show 3 projects for Breckinridge, totalling 350 MW of requested capacity. EIA-860M records 300 MW planned or under construction for Breckinridge. Breckinridge sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Breckinridge withdrew 2.93 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 65,618 people are employed in construction within a 120 km commute of Breckinridge (BLS QCEW), which frames staffing distance rather than free labour.
For Breckinridge, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Breckinridge, Kentucky describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Breckinridge, Kentucky, a specific address needs its own interconnection study, which this page does not attempt. The figures for Breckinridge, Kentucky refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.