Marshall, KY: data center power outlook

Marshall, Kentucky is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Marshall carries 23 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Marshall spans 5 utilities, with CITY OF BENTON - (KY), JACKSON PURCHASE ENERGY CORPORATION, PENNYRILE RURAL ELECTRIC COOP among those mapped.

Grid position at a glance

Serving utilities
CITY OF BENTON - (KY), JACKSON PURCHASE ENERGY CORPORATION, PENNYRILE RURAL ELECTRIC COOP, TENNESSEE VALLEY AUTHORITY, WEST KENTUCKY RURAL E C C
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
23
Industrial retail rate
7.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
5 serving utilities: 3.9 to 11.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
641 lb CO2/MWh
Water withdrawals
20 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
18,554 employed in construction within ~120 km (34 of 42 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Marshall

What follows is a screening-grade read of Marshall, Kentucky, built only from named public datasets. Grid access in Marshall extends to 500 kV, a high-voltage line class. The mapped layer packs 23 substations into Marshall, a dense spread of options.

Because Marshall, Kentucky sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. For Marshall, the rate shown is the state industrial average of 7.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Marshall that report an industrial rate span 5 serving utilities: 3.9 to 11.7¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Marshall, Kentucky, which may be quiet or simply uningested. Marshall, Kentucky has no EIA-860M generation on file, which reads as zero rather than as a gap. Marshall sits under a balancing authority that eGRID puts at 641.018 lb CO2 per MWh.

Marshall withdrew 19.64 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 18,554 people are employed in construction within a 120 km commute of Marshall (BLS QCEW), which frames staffing distance rather than free labour.

For Marshall, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Marshall, Kentucky describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Marshall, Kentucky, a specific address needs its own interconnection study, which this page does not attempt. The figures for Marshall, Kentucky refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources