Power by county

Morgan, KY: data center power outlook

Morgan, Kentucky is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Morgan carries 9 mapped substations within its boundary, and the highest reachable grid access is 69 kV. Service in Morgan spans 6 utilities, with BIG SANDY RURAL ELEC COOP CORP, CLARK ENERGY COOP INC - (KY), EAST KENTUCKY POWER COOP, INC among those mapped.

Grid position at a glance

Serving utilities
BIG SANDY RURAL ELEC COOP CORP, CLARK ENERGY COOP INC - (KY), EAST KENTUCKY POWER COOP, INC, GRAYSON RURAL ELECTRIC COOP CORP, KENTUCKY POWER CO, LICKING VALLEY RURAL E C C
ISO / market
PJM (PJM Interconnection)
Highest grid access
69 kV
Substations in county
9
Industrial retail rate
7.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
5 of 6 serving utilities: 8.2 to 9.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
1.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
28,844 employed in construction within ~120 km (41 of 52 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Morgan

The material below frames Morgan, Kentucky for a prospective large load, drawing only on public sources. At 69 kV, the strongest mapped access in Morgan is sub-transmission class. The mapped layer places 9 substations across Morgan, a moderate density.

Interconnection over Morgan runs through the PJM market (PJM Interconnection) and its rules. For Morgan, the rate shown is the state industrial average of 7.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Morgan that report an industrial rate span 5 of 6 serving utilities: 8.2 to 9.6¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Morgan, Kentucky in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Morgan, Kentucky has no EIA-860M generation on file, which reads as zero rather than as a gap. Morgan sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.

Morgan withdrew 1.55 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 28,844 people are employed in construction within a 120 km commute of Morgan (BLS QCEW), which frames staffing distance rather than free labour.

For Morgan, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Morgan, Kentucky describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Morgan, Kentucky, a specific address needs its own interconnection study, which this page does not attempt. The figures for Morgan, Kentucky refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources