Pike, KY: data center power outlook

Pike sits in the PJM market (PJM Interconnection); what follows is the screening-grade grid picture for Pike, Kentucky, drawn from public datasets. Counting from the mapped infrastructure, Pike holds 44 mapped substations and reaches 765 kV. Pike is covered by 4 retail service territories, including APPALACHIAN POWER CO, BIG SANDY RURAL ELEC COOP CORP, EAST KENTUCKY POWER COOP, INC.

Grid position at a glance

Serving utilities
APPALACHIAN POWER CO, BIG SANDY RURAL ELEC COOP CORP, EAST KENTUCKY POWER COOP, INC, KENTUCKY POWER CO
ISO / market
PJM (PJM Interconnection)
Highest grid access
765 kV
Substations in county
44
Industrial retail rate
7.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 4 serving utilities: 8.3 to 9.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
9.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
24,664 employed in construction within ~120 km (35 of 42 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Pike

Everything here about Pike, Kentucky comes from public federal and state records, with the gaps left visible. Pike reaches 765 kV, an extra-high-voltage class, at its strongest mapped point of grid access. With 44 substations mapped, Pike offers interconnection points across many locations.

Pike falls inside the PJM market (PJM Interconnection), which governs how its interconnection requests and capacity move. The rate for Pike is the 7.0 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Pike, reported per-utility industrial rates cover 2 of 4 serving utilities: 8.3 to 9.6¢/kWh, offered only as context beneath the state figure.

No interconnection-queue project is on record for Pike, Kentucky in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M lists nothing planned or under construction for Pike, Kentucky, which is a national filing and so a real zero. The balancing authority covering Pike carries a grid carbon intensity of 716.09 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Pike are 9.31 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Pike, some 24,664 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Pike are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Pike, Kentucky together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Pike, Kentucky is an address-level interconnection study; the county figures here only narrow where to look. For Pike, Kentucky, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.