Power by county

Woodford, KY: data center power outlook

The grid around Woodford, Kentucky is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Woodford the mapped layer shows 11 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Woodford is split among 4 utilities, among them BLUE GRASS ENERGY COOP CORP, CITY OF FRANKFORT - (KY), EAST KENTUCKY POWER COOP, INC.

Grid position at a glance

Serving utilities
BLUE GRASS ENERGY COOP CORP, CITY OF FRANKFORT - (KY), EAST KENTUCKY POWER COOP, INC, KENTUCKY UTILITIES CO
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
345 kV
Substations in county
11
Industrial retail rate
7.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 4 serving utilities: 7.1 to 8.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
1,894 lb CO2/MWh
Water withdrawals
3.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
68,710 employed in construction within ~120 km (47 of 63 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Woodford

The sections below set out what public data shows about siting a large electrical load in Woodford, Kentucky. At 345 kV, Woodford carries high-voltage transmission at its strongest mapped point. Woodford contains 11 mapped substations, a moderate footprint spread across the service area.

No organized wholesale market covers Woodford, Kentucky, so capacity moves through the local utility and bilateral agreements. Woodford carries the state industrial average retail rate of 7.0 cents per kWh from EIA-861, applied statewide. For Woodford, the per-utility spread is 3 of 4 serving utilities: 7.1 to 8.4¢/kWh, which qualifies but never replaces the state average.

For Woodford, Kentucky, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Woodford, Kentucky in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Woodford shows 1,894.234 lb CO2 per MWh.

For Woodford, the USGS 2015 compilation records 3.73 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Woodford sits within commuting range of roughly 68,710 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Woodford here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Woodford, Kentucky settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Woodford, Kentucky requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Woodford, Kentucky are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources