St. Landry, Louisiana is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. St. Landry carries 30 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in St. Landry spans 6 utilities, with CITY OF LAFAYETTE - (LA), CITY OF NEW ROADS - (LA), CLECO POWER LLC among those mapped.

Grid position at a glance

Serving utilities
CITY OF LAFAYETTE - (LA), CITY OF NEW ROADS - (LA), CLECO POWER LLC, ENTERGY LOUISIANA LLC, POINTE COUPEE ELEC MEMBER CORP, SOUTHWEST LOUISIANA E M C
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
500 kV
Substations in county
30
Industrial retail rate
6.2¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 6 serving utilities: 5.2 to 11.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
10 projects, 2,063 MW
Proposed generation
4 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
107 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
65,598 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in St. Landry

The material below frames St. Landry, Louisiana for a prospective large load, drawing only on public sources. Grid access in St. Landry extends to 500 kV, a high-voltage line class. The mapped layer packs 30 substations into St. Landry, a dense spread of options.

Interconnection over St. Landry runs through the MISO market (Midcontinent Independent System Operator) and its rules. For St. Landry, the rate shown is the state industrial average of 6.2 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving St. Landry that report an industrial rate span 4 of 6 serving utilities: 5.2 to 11.3¢/kWh, shown as context and never as the county rate.

The queue feeds show 10 projects for St. Landry, totalling 2,062.59 MW of requested capacity. EIA-860M records 4.3 MW planned or under construction for St. Landry. St. Landry sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.

St. Landry withdrew 106.52 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 65,598 people are employed in construction within a 120 km commute of St. Landry (BLS QCEW), which frames staffing distance rather than free labour.

For St. Landry, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for St. Landry, Louisiana describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in St. Landry, Louisiana, a specific address needs its own interconnection study, which this page does not attempt. The figures for St. Landry, Louisiana refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources