Hancock sits in the ISONE market (ISO New England); what follows is the screening-grade grid picture for Hancock, Maine, drawn from public datasets. Counting from the mapped infrastructure, Hancock holds 11 mapped substations and reaches 345 kV. Hancock is covered by 3 retail service territories, including CENTRAL MAINE POWER CO, EASTERN MAINE ELECTRIC COOP, VERSANT POWER.

Grid position at a glance

Serving utilities
CENTRAL MAINE POWER CO, EASTERN MAINE ELECTRIC COOP, VERSANT POWER
ISO / market
ISONE (ISO New England)
Highest grid access
345 kV
Substations in county
11
Industrial retail rate
15.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 serving utilities: 5.0 to 13.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
102 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
541 lb CO2/MWh
Water withdrawals
23 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
8,363 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Hancock

Below, Hancock in Maine is described from public data as a starting point for siting diligence. Hancock reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 11 substations mapped, Hancock has a moderate spread of interconnection points.

Hancock falls inside the ISONE market (ISO New England), which governs how its interconnection requests and capacity move. The rate for Hancock is the 15.5 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Hancock, reported per-utility industrial rates cover 3 serving utilities: 5.0 to 13.2¢/kWh, offered only as context beneath the state figure.

No interconnection-queue project is on record for Hancock, Maine in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Hancock has 102 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Hancock carries a grid carbon intensity of 541.365 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Hancock are 23.07 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Hancock, some 8,363 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Hancock are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Hancock, Maine together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Hancock, Maine is an address-level interconnection study; the county figures here only narrow where to look. For Hancock, Maine, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.