Caroline, MD: data center power outlook

Caroline, Maryland is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Caroline carries 9 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Caroline spans 3 utilities, with CHOPTANK ELECTRIC COOPERATIVE, INC, DELAWARE ELECTRIC COOPERATIVE, DELMARVA POWER among those mapped.

Grid position at a glance

Serving utilities
CHOPTANK ELECTRIC COOPERATIVE, INC, DELAWARE ELECTRIC COOPERATIVE, DELMARVA POWER
ISO / market
PJM (PJM Interconnection)
Highest grid access
230 kV
Substations in county
9
Industrial retail rate
12.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 3 serving utilities: 3.7 to 11.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
20 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
174,878 employed in construction within ~120 km (29 of 30 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Caroline

What follows is a screening-grade read of Caroline, Maryland, built only from named public datasets. At 230 kV, Caroline sits in the transmission class that a large load would look to. The mapped layer places 9 substations across Caroline, a moderate density.

Interconnection over Caroline runs through the PJM market (PJM Interconnection) and its rules. For Caroline, the rate shown is the state industrial average of 12.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Caroline that report an industrial rate span 2 of 3 serving utilities: 3.7 to 11.1¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Caroline, Maryland, which may be quiet or simply uningested. EIA-860M lists nothing planned or under construction for Caroline, Maryland, which is a national filing and so a real zero. Caroline sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.

Caroline withdrew 19.62 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 174,878 people are employed in construction within a 120 km commute of Caroline (BLS QCEW), which frames staffing distance rather than free labour.

For Caroline, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Caroline, Maryland describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Caroline, Maryland, a specific address needs its own interconnection study, which this page does not attempt. The figures for Caroline, Maryland refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.