Barnstable, MA: data center power outlook

Barnstable, Massachusetts is served through the ISONE market (ISO New England), and the figures below describe the public grid around a prospective data center site there. Barnstable carries 39 mapped substations within its boundary, and the highest reachable grid access is 345 kV. The serving utility mapped across Barnstable is NSTAR ELECTRIC COMPANY.

Grid position at a glance

Serving utilities
NSTAR ELECTRIC COMPANY
ISO / market
ISONE (ISO New England)
Highest grid access
345 kV
Substations in county
39
Industrial retail rate
19.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 serving utility: 9.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
541 lb CO2/MWh
Water withdrawals
45 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
78,993 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Barnstable

What follows is a screening-grade read of Barnstable, Massachusetts, built only from named public datasets. Grid access in Barnstable extends to 345 kV, a high-voltage line class. The mapped layer packs 39 substations into Barnstable, a dense spread of options.

Interconnection over Barnstable runs through the ISONE market (ISO New England) and its rules. For Barnstable, the rate shown is the state industrial average of 19.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Barnstable that report an industrial rate span 1 serving utility: 9.2¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Barnstable, Massachusetts in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M lists nothing planned or under construction for Barnstable, Massachusetts, which is a national filing and so a real zero. Barnstable sits under a balancing authority that eGRID puts at 541.365 lb CO2 per MWh.

Barnstable withdrew 45.03 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 78,993 people are employed in construction within a 120 km commute of Barnstable (BLS QCEW), which frames staffing distance rather than free labour.

For Barnstable, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Barnstable, Massachusetts describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Barnstable, Massachusetts, a specific address needs its own interconnection study, which this page does not attempt. The figures for Barnstable, Massachusetts refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.