Power by county
Cheboygan, MI: data center power outlook
Cheboygan, Michigan is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Cheboygan carries 10 mapped substations within its boundary, and the highest reachable grid access is 138 kV. Service in Cheboygan spans 7 utilities, with ALPENA POWER CO, CITY OF HARBOR SPRINGS - (MI), CONSUMERS ENERGY CO among those mapped.
Grid position at a glance
- Serving utilities
- ALPENA POWER CO, CITY OF HARBOR SPRINGS - (MI), CONSUMERS ENERGY CO, DTE ELECTRIC COMPANY, GREAT LAKES ENERGY COOP, PRESQUE ISLE ELEC & GAS COOP, WOLVERINE POWER SUPPLY COOP
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 138 kV
- Substations in county
- 10
- Industrial retail rate
- 8.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 7 serving utilities: 6.6 to 12.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 5 projects, 502 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 3.5 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 7,206 employed in construction within ~120 km (14 of 15 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Cheboygan
What follows is a screening-grade read of Cheboygan, Michigan, built only from named public datasets. At 138 kV, Cheboygan sits in the transmission class that a large load would look to. The mapped layer places 10 substations across Cheboygan, a moderate density.
Interconnection over Cheboygan runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Cheboygan, the rate shown is the state industrial average of 8.6 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Cheboygan that report an industrial rate span 5 of 7 serving utilities: 6.6 to 12.4¢/kWh, shown as context and never as the county rate.
The queue feeds show 5 projects for Cheboygan, totalling 501.8 MW of requested capacity. EIA-860M lists nothing planned or under construction for Cheboygan, Michigan, which is a national filing and so a real zero. Cheboygan sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Cheboygan withdrew 3.45 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 7,206 people are employed in construction within a 120 km commute of Cheboygan (BLS QCEW), which frames staffing distance rather than free labour.
For Cheboygan, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Cheboygan, Michigan describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Cheboygan, Michigan, a specific address needs its own interconnection study, which this page does not attempt. The figures for Cheboygan, Michigan refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.