Gladwin sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Gladwin, Michigan, drawn from public datasets. Counting from the mapped infrastructure, Gladwin holds 6 mapped substations and reaches 138 kV. Gladwin is covered by 3 retail service territories, including CONSUMERS ENERGY CO, DTE ELECTRIC COMPANY, WOLVERINE POWER SUPPLY COOP.
Grid position at a glance
- Serving utilities
- CONSUMERS ENERGY CO, DTE ELECTRIC COMPANY, WOLVERINE POWER SUPPLY COOP
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 138 kV
- Substations in county
- 6
- Industrial retail rate
- 8.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 3 serving utilities: 6.6 to 7.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 4 projects, 415 MW
- Proposed generation
- 145 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 2.1 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 19,916 employed in construction within ~120 km (26 of 27 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Gladwin
Below, Gladwin in Michigan is described from public data as a starting point for siting diligence. Gladwin reaches 138 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 6 substations mapped, Gladwin has a moderate spread of interconnection points.
Gladwin falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Gladwin is the 8.6 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Gladwin, reported per-utility industrial rates cover 2 of 3 serving utilities: 6.6 to 7.2¢/kWh, offered only as context beneath the state figure.
Gladwin has 4 interconnection-queue projects on record, totalling 415 MW of requested capacity. Gladwin has 145 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Gladwin carries a grid carbon intensity of 981.982 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Gladwin are 2.05 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Gladwin, some 19,916 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Gladwin are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Gladwin, Michigan together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Gladwin, Michigan is an address-level interconnection study; the county figures here only narrow where to look. For Gladwin, Michigan, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.