Power by county

Iosco, MI: data center power outlook

The grid around Iosco, Michigan is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Iosco the mapped layer shows 10 mapped substations, with grid access reaching 138 kV at its strongest point. Retail service across Iosco is split among 4 utilities, among them ALPENA POWER CO, CONSUMERS ENERGY CO, DTE ELECTRIC COMPANY.

Grid position at a glance

Serving utilities
ALPENA POWER CO, CONSUMERS ENERGY CO, DTE ELECTRIC COMPANY, PRESQUE ISLE ELEC & GAS COOP
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
138 kV
Substations in county
10
Industrial retail rate
8.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 serving utilities: 6.6 to 12.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
2 projects, 155 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
2.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
12,837 employed in construction within ~120 km (18 of 19 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Iosco

Read on for the public power picture of Iosco in Michigan, assembled for data center siting. Transmission-class access reaches 138 kV in Iosco at its strongest mapped point. Iosco contains 10 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Iosco clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Iosco carries the state industrial average retail rate of 8.6 cents per kWh from EIA-861, applied statewide. For Iosco, the per-utility spread is 4 serving utilities: 6.6 to 12.4¢/kWh, which qualifies but never replaces the state average.

Iosco carries 2 projects in the interconnection queue, totalling 155 MW of requested capacity. No generation is filed as planned or under construction in Iosco, Michigan in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Iosco shows 981.982 lb CO2 per MWh.

For Iosco, the USGS 2015 compilation records 2.73 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Iosco sits within commuting range of roughly 12,837 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Iosco here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Iosco, Michigan settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Iosco, Michigan requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Iosco, Michigan are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources