Power by county
Keweenaw, MI: data center power outlook
The grid around Keweenaw, Michigan is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Keweenaw the mapped layer shows 1 mapped substation, with grid access reaching 69 kV at its strongest point. Retail service across Keweenaw is split among 3 utilities, among them ONTONAGON COUNTY R E A, UPPER MICHIGAN ENERGY RESOURCES CORP., UPPER PENINSULA POWER COMPANY.
Grid position at a glance
- Serving utilities
- ONTONAGON COUNTY R E A, UPPER MICHIGAN ENERGY RESOURCES CORP., UPPER PENINSULA POWER COMPANY
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 69 kV
- Substations in county
- 1
- Industrial retail rate
- 8.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 3 serving utilities: 5.3 to 7.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 0.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 2,657 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Keweenaw
The sections below set out what public data shows about siting a large electrical load in Keweenaw, Michigan. Grid access in Keweenaw peaks at 69 kV, below the transmission class most large loads look for. Keweenaw, Michigan shows 1 substation in the mapped layer, a thin spread across the county.
Wholesale activity over Keweenaw clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Keweenaw carries the state industrial average retail rate of 8.6 cents per kWh from EIA-861, applied statewide. For Keweenaw, the per-utility spread is 2 of 3 serving utilities: 5.3 to 7.6¢/kWh, which qualifies but never replaces the state average.
Keweenaw, Michigan has nothing in the interconnection queue across the feeds covered here, quiet or uningested. No generation is filed as planned or under construction in Keweenaw, Michigan in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Keweenaw shows 981.982 lb CO2 per MWh.
For Keweenaw, the USGS 2015 compilation records 0.21 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Keweenaw sits within commuting range of roughly 2,657 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Keweenaw here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Keweenaw, Michigan settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Keweenaw, Michigan requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Keweenaw, Michigan are logged directly below, so each figure on this page can be traced back to its public dataset.