The grid around Osceola, Michigan is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Osceola the mapped layer shows 9 mapped substations, with grid access reaching 69 kV at its strongest point. Retail service across Osceola is split among 6 utilities, among them CHERRYLAND ELECTRIC COOP INC, CONSUMERS ENERGY CO, DTE ELECTRIC COMPANY.

Grid position at a glance

Serving utilities
CHERRYLAND ELECTRIC COOP INC, CONSUMERS ENERGY CO, DTE ELECTRIC COMPANY, GREAT LAKES ENERGY COOP, TRI-COUNTY ELECTRIC COOP (MI), WOLVERINE POWER SUPPLY COOP
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
69 kV
Substations in county
9
Industrial retail rate
8.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
5 of 6 serving utilities: 6.6 to 12.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
2 projects, 160 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
4.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
41,996 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Osceola

The sections below set out what public data shows about siting a large electrical load in Osceola, Michigan. Grid access in Osceola peaks at 69 kV, below the transmission class most large loads look for. Osceola contains 9 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Osceola clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Osceola carries the state industrial average retail rate of 8.6 cents per kWh from EIA-861, applied statewide. For Osceola, the per-utility spread is 5 of 6 serving utilities: 6.6 to 12.6¢/kWh, which qualifies but never replaces the state average.

Osceola carries 2 projects in the interconnection queue, totalling 160 MW of requested capacity. No generation is filed as planned or under construction in Osceola, Michigan in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Osceola shows 981.982 lb CO2 per MWh.

For Osceola, the USGS 2015 compilation records 4.25 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Osceola sits within commuting range of roughly 41,996 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Osceola here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Osceola, Michigan settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Osceola, Michigan requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Osceola, Michigan are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources