Power by county
Aitkin, MN: data center power outlook
Aitkin sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Aitkin, Minnesota, drawn from public datasets. Counting from the mapped infrastructure, Aitkin holds 18 mapped substations and reaches 250 kV. Aitkin is covered by 5 retail service territories, including AITKIN PUBLIC UTILITIES COMM, CROW WING COOPERATIVE POWER & LIGHT COMP, EAST CENTRAL ENERGY.
Grid position at a glance
- Serving utilities
- AITKIN PUBLIC UTILITIES COMM, CROW WING COOPERATIVE POWER & LIGHT COMP, EAST CENTRAL ENERGY, LAKE COUNTRY POWER, MILLE LACS ENERGY COOPERATIVE
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 250 kV
- Substations in county
- 18
- Industrial retail rate
- 9.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 8.0 to 12.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 1 projects, 220 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 5.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 12,705 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Aitkin
Everything here about Aitkin, Minnesota comes from public federal and state records, with the gaps left visible. Aitkin reaches 250 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 18 substations mapped, Aitkin has a moderate spread of interconnection points.
Aitkin falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Aitkin is the 9.3 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Aitkin, reported per-utility industrial rates cover 4 of 5 serving utilities: 8.0 to 12.0¢/kWh, offered only as context beneath the state figure.
Aitkin has 1 interconnection-queue project on record, totalling 220 MW of requested capacity. EIA-860M lists nothing planned or under construction for Aitkin, Minnesota, which is a national filing and so a real zero. The balancing authority covering Aitkin carries a grid carbon intensity of 981.982 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Aitkin are 5.41 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Aitkin, some 12,705 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Aitkin are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Aitkin, Minnesota together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Aitkin, Minnesota is an address-level interconnection study; the county figures here only narrow where to look. For Aitkin, Minnesota, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.