Power by county
Freeborn, MN: data center power outlook
Freeborn, Minnesota is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Freeborn carries 43 mapped substations within its boundary, and the highest reachable grid access is 161 kV. Service in Freeborn spans 7 utilities, with BENCO ELECTRIC COOPERATIVE, CITY OF AUSTIN - (MN), FREEBORN MOWER ELECTRIC COOPERATIVE among those mapped.
Grid position at a glance
- Serving utilities
- BENCO ELECTRIC COOPERATIVE, CITY OF AUSTIN - (MN), FREEBORN MOWER ELECTRIC COOPERATIVE, HEARTLAND POWER COOP, INTERSTATE POWER AND LIGHT CO, NORTHERN STATES POWER CO - MINNESOTA, STEELE-WASECA COOPERATIVE ELECTRIC
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 161 kV
- Substations in county
- 43
- Industrial retail rate
- 9.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 7 serving utilities: 8.7 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 8 projects, 1,240 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 5.9 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 35,359 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Freeborn
The material below frames Freeborn, Minnesota for a prospective large load, drawing only on public sources. At 161 kV, Freeborn sits in the transmission class that a large load would look to. The mapped layer packs 43 substations into Freeborn, a dense spread of options.
Interconnection over Freeborn runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Freeborn, the rate shown is the state industrial average of 9.3 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Freeborn that report an industrial rate span 5 of 7 serving utilities: 8.7 to 9.7¢/kWh, shown as context and never as the county rate.
The queue feeds show 8 projects for Freeborn, totalling 1,240 MW of requested capacity. EIA-860M lists nothing planned or under construction for Freeborn, Minnesota, which is a national filing and so a real zero. Freeborn sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Freeborn withdrew 5.85 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 35,359 people are employed in construction within a 120 km commute of Freeborn (BLS QCEW), which frames staffing distance rather than free labour.
For Freeborn, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Freeborn, Minnesota describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Freeborn, Minnesota, a specific address needs its own interconnection study, which this page does not attempt. The figures for Freeborn, Minnesota refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.