Red Lake, MN: data center power outlook
For Red Lake, Minnesota, the public grid picture begins with its place in the MISO market (Midcontinent Independent System Operator) and the infrastructure mapped inside the county. Grid access across Red Lake tops out at 115 kV, over a footprint of 8 mapped substations. In Red Lake, 5 utilities share the retail territory, among them CLEARWATER-POLK ELEC COOP INC, OTTER TAIL POWER CO, P K M ELECTRIC COOP, INC.
Grid position at a glance
- Serving utilities
- CLEARWATER-POLK ELEC COOP INC, OTTER TAIL POWER CO, P K M ELECTRIC COOP, INC, RED LAKE ELECTRIC COOP, INC, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 115 kV
- Substations in county
- 8
- Industrial retail rate
- 9.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 1 of 5 serving utilities: 5.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 1 projects, 130 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 2.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 8,798 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Red Lake
This page gathers the public grid evidence for Red Lake, Minnesota that bears on a large new load. The strongest mapped access in Red Lake is 115 kV, squarely transmission class. Red Lake carries 8 substations in the mapped layer, spread across the county.
For Red Lake, the MISO market (Midcontinent Independent System Operator) is the operator that handles interconnection and capacity. The state industrial average retail rate is 9.3 cents per kWh, drawn from EIA-861 and applied to Red Lake at the state level rather than as a county rate. The serving utilities in Red Lake that publish a rate range 1 of 5 serving utilities: 5.4¢/kWh, a spread kept separate from the state average.
On record for Red Lake are 1 interconnection-queue project, totalling 130 MW of requested capacity. No generation is filed as planned or under construction in Red Lake, Minnesota in the federal EIA-860M inventory, a measured zero rather than missing data. Grid carbon intensity for Red Lake, via its balancing authority, is 981.982 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Red Lake at 2.22 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Red Lake, about 8,798 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Red Lake figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Red Lake, Minnesota qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Red Lake, Minnesota turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Red Lake, Minnesota traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.