Power by county
Clarke, MS: data center power outlook
The grid around Clarke, Mississippi is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Clarke the mapped layer shows 14 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Clarke is split among 6 utilities, among them ALABAMA POWER CO, BLACK WARRIOR ELEC MEMBER CORP, DIXIE ELECTRIC POWER ASSN.
Grid position at a glance
- Serving utilities
- ALABAMA POWER CO, BLACK WARRIOR ELEC MEMBER CORP, DIXIE ELECTRIC POWER ASSN, MISSISSIPPI POWER CO, SINGING RIVER ELEC COOPERATIVE, SOUTHERN PINE ELECTRIC COOPERATIVE
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 230 kV
- Substations in county
- 14
- Industrial retail rate
- 7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 6 serving utilities: 7.1 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 843 lb CO2/MWh
- Water withdrawals
- 2.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 9,056 employed in construction within ~120 km (21 of 24 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Clarke
Read on for the public power picture of Clarke in Mississippi, assembled for data center siting. Transmission-class access reaches 230 kV in Clarke at its strongest mapped point. Clarke contains 14 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Clarke clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Clarke carries the state industrial average retail rate of 7.4 cents per kWh from EIA-861, applied statewide. For Clarke, the per-utility spread is 4 of 6 serving utilities: 7.1 to 9.7¢/kWh, which qualifies but never replaces the state average.
Clarke, Mississippi shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. The federal EIA-860M inventory files no planned or under-construction generation in Clarke, Mississippi, a real zero rather than a gap. In eGRID, the balancing authority over Clarke shows 842.741 lb CO2 per MWh.
For Clarke, the USGS 2015 compilation records 2.79 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Clarke sits within commuting range of roughly 9,056 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Clarke here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Clarke, Mississippi settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Clarke, Mississippi requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Clarke, Mississippi are logged directly below, so each figure on this page can be traced back to its public dataset.