The grid around Coahoma, Mississippi is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Coahoma the mapped layer shows 13 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Coahoma is split among 6 utilities, among them CLARKSDALE PUBLIC UTILITIES, COAHOMA ELECTRIC POWER ASSN, DELTA ELECTRIC POWER ASSN.
Grid position at a glance
- Serving utilities
- CLARKSDALE PUBLIC UTILITIES, COAHOMA ELECTRIC POWER ASSN, DELTA ELECTRIC POWER ASSN, ENTERGY ARKANSAS LLC, ENTERGY MISSISSIPPI LLC, WOODRUFF ELECTRIC COOP CORP
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 230 kV
- Substations in county
- 13
- Industrial retail rate
- 7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 6 serving utilities: 8.3 to 13.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 6 projects, 677 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 131 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 7,627 employed in construction within ~120 km (24 of 27 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Coahoma
The sections below set out what public data shows about siting a large electrical load in Coahoma, Mississippi. Transmission-class access reaches 230 kV in Coahoma at its strongest mapped point. Coahoma contains 13 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Coahoma clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Coahoma carries the state industrial average retail rate of 7.4 cents per kWh from EIA-861, applied statewide. For Coahoma, the per-utility spread is 2 of 6 serving utilities: 8.3 to 13.8¢/kWh, which qualifies but never replaces the state average.
Coahoma carries 6 projects in the interconnection queue, totalling 676.93 MW of requested capacity. For Coahoma, Mississippi, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Coahoma shows 981.982 lb CO2 per MWh.
For Coahoma, the USGS 2015 compilation records 131.44 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Coahoma sits within commuting range of roughly 7,627 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Coahoma here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Coahoma, Mississippi settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Coahoma, Mississippi requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Coahoma, Mississippi are logged directly below, so each figure on this page can be traced back to its public dataset.