Power by county
Jefferson, MS: data center power outlook
The grid around Jefferson, Mississippi is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Jefferson the mapped layer shows 4 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Jefferson is split among 4 utilities, among them CONCORDIA ELECTRIC COOP, INC, ENTERGY LOUISIANA LLC, ENTERGY MISSISSIPPI LLC.
Grid position at a glance
- Serving utilities
- CONCORDIA ELECTRIC COOP, INC, ENTERGY LOUISIANA LLC, ENTERGY MISSISSIPPI LLC, SOUTHWEST MISSISSIPPI E P A
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 500 kV
- Substations in county
- 4
- Industrial retail rate
- 7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 4 serving utilities: 8.3 to 9.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 3 projects, 800 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 1.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 8,417 employed in construction within ~120 km (22 of 29 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Jefferson
The sections below set out what public data shows about siting a large electrical load in Jefferson, Mississippi. At 500 kV, Jefferson carries high-voltage transmission at its strongest mapped point. Jefferson, Mississippi shows 4 substations in the mapped layer, a thin spread across the county.
Wholesale activity over Jefferson clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Jefferson carries the state industrial average retail rate of 7.4 cents per kWh from EIA-861, applied statewide. For Jefferson, the per-utility spread is 2 of 4 serving utilities: 8.3 to 9.6¢/kWh, which qualifies but never replaces the state average.
Jefferson carries 3 projects in the interconnection queue, totalling 800 MW of requested capacity. The federal EIA-860M inventory files no planned or under-construction generation in Jefferson, Mississippi, a real zero rather than a gap. In eGRID, the balancing authority over Jefferson shows 981.982 lb CO2 per MWh.
For Jefferson, the USGS 2015 compilation records 1.37 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Jefferson sits within commuting range of roughly 8,417 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Jefferson here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Jefferson, Mississippi settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Jefferson, Mississippi requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Jefferson, Mississippi are logged directly below, so each figure on this page can be traced back to its public dataset.