Power by county
Lawrence, MS: data center power outlook
Lawrence, Mississippi is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Lawrence carries 6 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Lawrence spans 4 utilities, with ENTERGY MISSISSIPPI LLC, MAGNOLIA ELECTRIC POWER ASSN, MISSISSIPPI POWER CO among those mapped.
Grid position at a glance
- Serving utilities
- ENTERGY MISSISSIPPI LLC, MAGNOLIA ELECTRIC POWER ASSN, MISSISSIPPI POWER CO, SOUTHERN PINE ELECTRIC COOPERATIVE
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 115 kV
- Substations in county
- 6
- Industrial retail rate
- 7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 serving utilities: 7.1 to 9.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 843 lb CO2/MWh
- Water withdrawals
- 40 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 20,352 employed in construction within ~120 km (25 of 29 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Lawrence
What follows is a screening-grade read of Lawrence, Mississippi, built only from named public datasets. At 115 kV, Lawrence sits in the transmission class that a large load would look to. The mapped layer places 6 substations across Lawrence, a moderate density.
Interconnection over Lawrence runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Lawrence, the rate shown is the state industrial average of 7.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Lawrence that report an industrial rate span 4 serving utilities: 7.1 to 9.3¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Lawrence, Mississippi in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M lists nothing planned or under construction for Lawrence, Mississippi, which is a national filing and so a real zero. Lawrence sits under a balancing authority that eGRID puts at 842.741 lb CO2 per MWh.
Lawrence withdrew 39.54 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 20,352 people are employed in construction within a 120 km commute of Lawrence (BLS QCEW), which frames staffing distance rather than free labour.
For Lawrence, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Lawrence, Mississippi describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Lawrence, Mississippi, a specific address needs its own interconnection study, which this page does not attempt. The figures for Lawrence, Mississippi refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.