The grid around Prentiss, Mississippi is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Prentiss the mapped layer shows 10 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Prentiss is split among 6 utilities, among them ALCORN COUNTY ELEC POWER ASSN, CITY OF NEW ALBANY - (MS), PRENTISS COUNTY ELEC PWR ASSN.
Grid position at a glance
- Serving utilities
- ALCORN COUNTY ELEC POWER ASSN, CITY OF NEW ALBANY - (MS), PRENTISS COUNTY ELEC PWR ASSN, TIPPAH ELECTRIC POWER ASSN, TISHOMINGO COUNTY E P A, TOMBIGBEE ELECTRIC POWER ASSN
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 10
- Industrial retail rate
- 7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 6 serving utilities: 5.2 to 9.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 3.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 15,808 employed in construction within ~120 km (30 of 31 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Prentiss
Read on for the public power picture of Prentiss in Mississippi, assembled for data center siting. At 500 kV, Prentiss carries high-voltage transmission at its strongest mapped point. Prentiss contains 10 mapped substations, a moderate footprint spread across the service area.
No organized wholesale market covers Prentiss, Mississippi, so capacity moves through the local utility and bilateral agreements. Prentiss carries the state industrial average retail rate of 7.4 cents per kWh from EIA-861, applied statewide. For Prentiss, the per-utility spread is 6 serving utilities: 5.2 to 9.0¢/kWh, which qualifies but never replaces the state average.
For Prentiss, Mississippi, no queued project appears in the feeds currently covered. The federal EIA-860M inventory files no planned or under-construction generation in Prentiss, Mississippi, a real zero rather than a gap. In eGRID, the balancing authority over Prentiss shows 641.018 lb CO2 per MWh.
For Prentiss, the USGS 2015 compilation records 3.4 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Prentiss sits within commuting range of roughly 15,808 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Prentiss here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Prentiss, Mississippi settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Prentiss, Mississippi requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Prentiss, Mississippi are logged directly below, so each figure on this page can be traced back to its public dataset.