Power by county
Rankin, MS: data center power outlook
Rankin, Mississippi is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Rankin carries 29 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Rankin spans 5 utilities, with CENTRAL ELECTRIC POWER ASSN - (MS), ENTERGY MISSISSIPPI LLC, MISSISSIPPI POWER CO among those mapped.
Grid position at a glance
- Serving utilities
- CENTRAL ELECTRIC POWER ASSN - (MS), ENTERGY MISSISSIPPI LLC, MISSISSIPPI POWER CO, SOUTHERN PINE ELECTRIC COOPERATIVE, YAZOO VALLEY ELEC POWER ASSN
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 230 kV
- Substations in county
- 29
- Industrial retail rate
- 7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 serving utilities: 6.9 to 9.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 1 projects, 200 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 21 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 17,803 employed in construction within ~120 km (22 of 25 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Rankin
What follows is a screening-grade read of Rankin, Mississippi, built only from named public datasets. At 230 kV, Rankin sits in the transmission class that a large load would look to. The mapped layer packs 29 substations into Rankin, a dense spread of options.
Interconnection over Rankin runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Rankin, the rate shown is the state industrial average of 7.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Rankin that report an industrial rate span 5 serving utilities: 6.9 to 9.3¢/kWh, shown as context and never as the county rate.
The queue feeds show 1 project for Rankin, totalling 200 MW of requested capacity. EIA-860M lists nothing planned or under construction for Rankin, Mississippi, which is a national filing and so a real zero. Rankin sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Rankin withdrew 20.76 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 17,803 people are employed in construction within a 120 km commute of Rankin (BLS QCEW), which frames staffing distance rather than free labour.
For Rankin, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Rankin, Mississippi describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Rankin, Mississippi, a specific address needs its own interconnection study, which this page does not attempt. The figures for Rankin, Mississippi refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.