Tunica, MS: data center power outlook
Tunica, Mississippi is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Tunica carries 7 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Tunica spans 5 utilities, with COAHOMA ELECTRIC POWER ASSN, ENTERGY ARKANSAS LLC, ENTERGY MISSISSIPPI LLC among those mapped.
Grid position at a glance
- Serving utilities
- COAHOMA ELECTRIC POWER ASSN, ENTERGY ARKANSAS LLC, ENTERGY MISSISSIPPI LLC, TALLAHATCHIE VALLEY E P A, WOODRUFF ELECTRIC COOP CORP
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 230 kV
- Substations in county
- 7
- Industrial retail rate
- 7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 5 serving utilities: 8.3 to 8.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 13 projects, 1,997 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 109 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 29,164 employed in construction within ~120 km (24 of 28 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Tunica
What follows is a screening-grade read of Tunica, Mississippi, built only from named public datasets. At 230 kV, Tunica sits in the transmission class that a large load would look to. The mapped layer places 7 substations across Tunica, a moderate density.
Interconnection over Tunica runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Tunica, the rate shown is the state industrial average of 7.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Tunica that report an industrial rate span 2 of 5 serving utilities: 8.3 to 8.9¢/kWh, shown as context and never as the county rate.
The queue feeds show 13 projects for Tunica, totalling 1,996.6 MW of requested capacity. Tunica, Mississippi has no EIA-860M generation on file, which reads as zero rather than as a gap. Tunica sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Tunica withdrew 108.61 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 29,164 people are employed in construction within a 120 km commute of Tunica (BLS QCEW), which frames staffing distance rather than free labour.
For Tunica, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Tunica, Mississippi describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Tunica, Mississippi, a specific address needs its own interconnection study, which this page does not attempt. The figures for Tunica, Mississippi refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.