Barry, MO: data center power outlook

Barry, Missouri is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Barry carries 13 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Barry spans 8 utilities, with BARRY ELECTRIC COOP, CARROLL ELECTRIC COOP CORP - (AR), CITY OF MONETT - (MO) among those mapped.

Grid position at a glance

Serving utilities
BARRY ELECTRIC COOP, CARROLL ELECTRIC COOP CORP - (AR), CITY OF MONETT - (MO), EMPIRE DISTRICT ELECTRIC CO, ENTERGY ARKANSAS LLC, NEW-MAC ELECTRIC COOP, INC, OZARK ELECTRIC COOP INC - (MO), SOUTHWEST ARKANSAS E C C
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
345 kV
Substations in county
13
Industrial retail rate
8.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 8 serving utilities: 7.0 to 10.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
18 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
36,486 employed in construction within ~120 km (23 of 25 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Barry

The material below frames Barry, Missouri for a prospective large load, drawing only on public sources. Grid access in Barry extends to 345 kV, a high-voltage line class. The mapped layer places 13 substations across Barry, a moderate density.

Barry, Missouri is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Barry, the rate shown is the state industrial average of 8.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Barry that report an industrial rate span 4 of 8 serving utilities: 7.0 to 10.9¢/kWh, shown as context and never as the county rate.

Across the covered feeds, Barry, Missouri carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Barry, Missouri in EIA-860M as planned or under construction, which counts as a measured zero. Barry sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.

Barry withdrew 17.65 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 36,486 people are employed in construction within a 120 km commute of Barry (BLS QCEW), which frames staffing distance rather than free labour.

For Barry, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Barry, Missouri describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Barry, Missouri, a specific address needs its own interconnection study, which this page does not attempt. The figures for Barry, Missouri refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.