Howard, MO: data center power outlook
Howard, Missouri is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Howard carries 2 mapped substations within its boundary, and the highest reachable grid access is 161 kV. Service in Howard spans 9 utilities, with BOONE ELECTRIC COOP, CENTRAL MISSOURI ELEC COOP INC, CITY OF FAYETTE - (MO) among those mapped.
Grid position at a glance
- Serving utilities
- BOONE ELECTRIC COOP, CENTRAL MISSOURI ELEC COOP INC, CITY OF FAYETTE - (MO), CO-MO ELECTRIC COOP INC, EVERGY MISSOURI WEST, FARMERS ELECTRIC COOP, INC - (MO), HOWARD ELECTRIC COOP, MACON ELECTRIC COOP, UNION ELECTRIC CO - (MO)
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 161 kV
- Substations in county
- 2
- Industrial retail rate
- 8.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 7 of 9 serving utilities: 6.9 to 10.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 1,285 lb CO2/MWh
- Water withdrawals
- 4.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 15,743 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Howard
The material below frames Howard, Missouri for a prospective large load, drawing only on public sources. At 161 kV, Howard sits in the transmission class that a large load would look to. Howard, Missouri carries a thin 2-substation footprint in the mapped layer, concentrating where a connection could land.
Interconnection over Howard runs through the SPP market (Southwest Power Pool) and its rules. For Howard, the rate shown is the state industrial average of 8.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Howard that report an industrial rate span 7 of 9 serving utilities: 6.9 to 10.1¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Howard, Missouri in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Nothing is on file for Howard, Missouri in EIA-860M as planned or under construction, which counts as a measured zero. Howard sits under a balancing authority that eGRID puts at 1,285.192 lb CO2 per MWh.
Howard withdrew 4.6 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 15,743 people are employed in construction within a 120 km commute of Howard (BLS QCEW), which frames staffing distance rather than free labour.
For Howard, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Howard, Missouri describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Howard, Missouri, a specific address needs its own interconnection study, which this page does not attempt. The figures for Howard, Missouri refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.