Power by county

Livingston, MO: data center power outlook

Livingston, Missouri is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Livingston carries 12 mapped substations within its boundary, and the highest reachable grid access is 161 kV. Service in Livingston spans 6 utilities, with CHILLICOTHE MUNICIPAL UTILS, EVERGY MISSOURI WEST, FARMERS ELECTRIC COOP, INC - (MO) among those mapped.

Grid position at a glance

Serving utilities
CHILLICOTHE MUNICIPAL UTILS, EVERGY MISSOURI WEST, FARMERS ELECTRIC COOP, INC - (MO), GRUNDY ELECTRIC COOP, INC, MACON ELECTRIC COOP, NORTH CENTRAL MO ELEC COOP INC
ISO / market
SPP (Southwest Power Pool)
Highest grid access
161 kV
Substations in county
12
Industrial retail rate
8.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 6 serving utilities: 6.9 to 7.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
1,285 lb CO2/MWh
Water withdrawals
2.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
37,535 employed in construction within ~120 km (28 of 33 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Livingston

The material below frames Livingston, Missouri for a prospective large load, drawing only on public sources. At 161 kV, Livingston sits in the transmission class that a large load would look to. The mapped layer places 12 substations across Livingston, a moderate density.

Interconnection over Livingston runs through the SPP market (Southwest Power Pool) and its rules. For Livingston, the rate shown is the state industrial average of 8.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Livingston that report an industrial rate span 3 of 6 serving utilities: 6.9 to 7.2¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Livingston, Missouri, which may be quiet or simply uningested. EIA-860M lists nothing planned or under construction for Livingston, Missouri, which is a national filing and so a real zero. Livingston sits under a balancing authority that eGRID puts at 1,285.192 lb CO2 per MWh.

Livingston withdrew 2.69 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 37,535 people are employed in construction within a 120 km commute of Livingston (BLS QCEW), which frames staffing distance rather than free labour.

For Livingston, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Livingston, Missouri describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Livingston, Missouri, a specific address needs its own interconnection study, which this page does not attempt. The figures for Livingston, Missouri refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources