Power by county
Morgan, MO: data center power outlook
For Morgan, Missouri, the public grid picture begins with its place in an area outside an organized wholesale market and the infrastructure mapped inside the county. Grid access across Morgan tops out at 161 kV, over a footprint of 7 mapped substations. In Morgan, 6 utilities share the retail territory, among them CENTRAL MISSOURI ELEC COOP INC, CO-MO ELECTRIC COOP INC, EVERGY MISSOURI WEST.
Grid position at a glance
- Serving utilities
- CENTRAL MISSOURI ELEC COOP INC, CO-MO ELECTRIC COOP INC, EVERGY MISSOURI WEST, SOUTHWEST ELECTRIC COOP, INC, THREE RIVERS ELECTRIC COOP, UNION ELECTRIC CO - (MO)
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 161 kV
- Substations in county
- 7
- Industrial retail rate
- 8.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 6 serving utilities: 6.9 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 1,285 lb CO2/MWh
- Water withdrawals
- 10 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 16,528 employed in construction within ~120 km (27 of 28 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Morgan
This page gathers the public grid evidence for Morgan, Missouri that bears on a large new load. The strongest mapped access in Morgan is 161 kV, squarely transmission class. Morgan carries 7 substations in the mapped layer, spread across the county.
There is no organized wholesale market over Morgan, Missouri; arrangements run through the serving utility instead. The state industrial average retail rate is 8.4 cents per kWh, drawn from EIA-861 and applied to Morgan at the state level rather than as a county rate. The serving utilities in Morgan that publish a rate range 5 of 6 serving utilities: 6.9 to 9.7¢/kWh, a spread kept separate from the state average.
Morgan, Missouri shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. No generation is filed as planned or under construction in Morgan, Missouri in the federal EIA-860M inventory, a measured zero rather than missing data. Grid carbon intensity for Morgan, via its balancing authority, is 1,285.192 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Morgan at 10.21 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Morgan, about 16,528 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Morgan figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Morgan, Missouri qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Morgan, Missouri turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Morgan, Missouri traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.