Stoddard, MO: data center power outlook

Stoddard, Missouri is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Stoddard carries 19 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Stoddard spans 4 utilities, with BLACK RIVER ELECTRIC COOP - (MO), OZARK BORDER ELECTRIC COOP, SEMO ELECTRIC COOPERATIVE among those mapped.

Grid position at a glance

Serving utilities
BLACK RIVER ELECTRIC COOP - (MO), OZARK BORDER ELECTRIC COOP, SEMO ELECTRIC COOPERATIVE, UNION ELECTRIC CO - (MO)
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
345 kV
Substations in county
19
Industrial retail rate
8.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 serving utilities: 7.2 to 8.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
8 projects, 1,220 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
518 lb CO2/MWh
Water withdrawals
270 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
13,574 employed in construction within ~120 km (29 of 36 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Stoddard

What follows is a screening-grade read of Stoddard, Missouri, built only from named public datasets. Grid access in Stoddard extends to 345 kV, a high-voltage line class. The mapped layer places 19 substations across Stoddard, a moderate density.

Interconnection over Stoddard runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Stoddard, the rate shown is the state industrial average of 8.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Stoddard that report an industrial rate span 4 serving utilities: 7.2 to 8.9¢/kWh, shown as context and never as the county rate.

The queue feeds show 8 projects for Stoddard, totalling 1,220 MW of requested capacity. EIA-860M lists nothing planned or under construction for Stoddard, Missouri, which is a national filing and so a real zero. Stoddard sits under a balancing authority that eGRID puts at 518.094 lb CO2 per MWh.

Stoddard withdrew 270.35 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 13,574 people are employed in construction within a 120 km commute of Stoddard (BLS QCEW), which frames staffing distance rather than free labour.

For Stoddard, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Stoddard, Missouri describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Stoddard, Missouri, a specific address needs its own interconnection study, which this page does not attempt. The figures for Stoddard, Missouri refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.