Dawson, NE: data center power outlook

The grid around Dawson, Nebraska is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Dawson the mapped layer shows 41 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Dawson is split among 7 utilities, among them CITY OF GOTHENBURG - (NE), CITY OF LEXINGTON - (NE), COZAD BOARD OF PUBLIC WORKS.

Grid position at a glance

Serving utilities
CITY OF GOTHENBURG - (NE), CITY OF LEXINGTON - (NE), COZAD BOARD OF PUBLIC WORKS, CUSTER PUBLIC POWER DISTRICT, DAWSON POWER DISTRICT, MCCOOK PUBLIC POWER DISTRICT, SOUTHERN PUBLIC POWER DISTRICT
ISO / market
SPP (Southwest Power Pool)
Highest grid access
230 kV
Substations in county
41
Industrial retail rate
8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 7 serving utilities: 6.4 to 13.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
211 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
7,107 employed in construction within ~120 km (14 of 21 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Dawson

The sections below set out what public data shows about siting a large electrical load in Dawson, Nebraska. Transmission-class access reaches 230 kV in Dawson at its strongest mapped point. Dawson contains 41 mapped substations, a dense footprint that spreads interconnection options across many points.

Wholesale activity over Dawson clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Dawson carries the state industrial average retail rate of 8.0 cents per kWh from EIA-861, applied statewide. For Dawson, the per-utility spread is 4 of 7 serving utilities: 6.4 to 13.0¢/kWh, which qualifies but never replaces the state average.

Dawson, Nebraska has nothing in the interconnection queue across the feeds covered here, quiet or uningested. The federal EIA-860M inventory files no planned or under-construction generation in Dawson, Nebraska, a real zero rather than a gap. In eGRID, the balancing authority over Dawson shows 871.526 lb CO2 per MWh.

For Dawson, the USGS 2015 compilation records 211.23 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Dawson sits within commuting range of roughly 7,107 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Dawson here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Dawson, Nebraska settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Dawson, Nebraska requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Dawson, Nebraska are logged directly below, so each figure on this page can be traced back to its public dataset.