Power by county

Garfield, NE: data center power outlook

Garfield, Nebraska is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Garfield carries 5 mapped substations within its boundary, and the highest reachable grid access is 69 kV. Service in Garfield spans 5 utilities, with CITY OF BURWELL - (NE), CUSTER PUBLIC POWER DISTRICT, LOUP VALLEYS RURAL P P D among those mapped.

Grid position at a glance

Serving utilities
CITY OF BURWELL - (NE), CUSTER PUBLIC POWER DISTRICT, LOUP VALLEYS RURAL P P D, NIOBRARA VALLEY EL MEMBER CORP, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
SPP (Southwest Power Pool)
Highest grid access
69 kV
Substations in county
5
Industrial retail rate
8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 5 serving utilities: 13.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
21 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
3,922 employed in construction within ~120 km (12 of 18 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Garfield

The material below frames Garfield, Nebraska for a prospective large load, drawing only on public sources. At 69 kV, the strongest mapped access in Garfield is sub-transmission class. Garfield, Nebraska carries a thin 5-substation footprint in the mapped layer, concentrating where a connection could land.

Interconnection over Garfield runs through the SPP market (Southwest Power Pool) and its rules. For Garfield, the rate shown is the state industrial average of 8.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Garfield that report an industrial rate span 1 of 5 serving utilities: 13.0¢/kWh, shown as context and never as the county rate.

Across the covered feeds, Garfield, Nebraska carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Garfield, Nebraska in EIA-860M as planned or under construction, which counts as a measured zero. Garfield sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.

Garfield withdrew 20.58 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 3,922 people are employed in construction within a 120 km commute of Garfield (BLS QCEW), which frames staffing distance rather than free labour.

For Garfield, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Garfield, Nebraska describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Garfield, Nebraska, a specific address needs its own interconnection study, which this page does not attempt. The figures for Garfield, Nebraska refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources