Power by county
Morrill, NE: data center power outlook
Morrill, Nebraska is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Morrill carries 9 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Morrill spans 9 utilities, with CHIMNEY ROCK PUBLIC POWER DIST, CITY OF BAYARD - (NE), CITY OF BRIDGEPORT UTILITIES - (NE) among those mapped.
Grid position at a glance
- Serving utilities
- CHIMNEY ROCK PUBLIC POWER DIST, CITY OF BAYARD - (NE), CITY OF BRIDGEPORT UTILITIES - (NE), HIGH WEST ENERGY, INC, NEBRASKA PUBLIC POWER DISTRICT, PANHANDLE RURAL EL MEMBER ASSN, WAPA-- WESTERN AREA POWER ADMINISTRATION, WHEAT BELT PUBLIC POWER DIST, WYRULEC COMPANY
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 115 kV
- Substations in county
- 9
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 9 serving utilities: 4.5 to 11.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 111 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 2,078 employed in construction within ~120 km (11 of 14 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Morrill
The material below frames Morrill, Nebraska for a prospective large load, drawing only on public sources. At 115 kV, Morrill sits in the transmission class that a large load would look to. The mapped layer places 9 substations across Morrill, a moderate density.
Interconnection over Morrill runs through the SPP market (Southwest Power Pool) and its rules. For Morrill, the rate shown is the state industrial average of 8.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Morrill that report an industrial rate span 2 of 9 serving utilities: 4.5 to 11.7¢/kWh, shown as context and never as the county rate.
The covered queue feeds list nothing for Morrill, Nebraska, which may be quiet or simply uningested. EIA-860M lists nothing planned or under construction for Morrill, Nebraska, which is a national filing and so a real zero. Morrill sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.
Morrill withdrew 111.24 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 2,078 people are employed in construction within a 120 km commute of Morrill (BLS QCEW), which frames staffing distance rather than free labour.
For Morrill, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Morrill, Nebraska describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Morrill, Nebraska, a specific address needs its own interconnection study, which this page does not attempt. The figures for Morrill, Nebraska refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.