The grid around Pawnee, Nebraska is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Pawnee the mapped layer shows 4 mapped substations, with grid access reaching 115 kV at its strongest point. Retail service across Pawnee is split among 6 utilities, among them BLUESTEM ELECTRIC COOP INC, CITY OF SUMMERFIELD - (KS), EVERGY KANSAS CENTRAL, INC.
Grid position at a glance
- Serving utilities
- BLUESTEM ELECTRIC COOP INC, CITY OF SUMMERFIELD - (KS), EVERGY KANSAS CENTRAL, INC, NEBRASKA PUBLIC POWER DISTRICT, NORRIS PUBLIC POWER DISTRICT, OMAHA PUBLIC POWER DISTRICT
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 115 kV
- Substations in county
- 4
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 6 serving utilities: 4.5 to 7.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 4.0 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 27,197 employed in construction within ~120 km (27 of 29 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Pawnee
The sections below set out what public data shows about siting a large electrical load in Pawnee, Nebraska. Transmission-class access reaches 115 kV in Pawnee at its strongest mapped point. Pawnee, Nebraska shows 4 substations in the mapped layer, a thin spread across the county.
Wholesale activity over Pawnee clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Pawnee carries the state industrial average retail rate of 8.0 cents per kWh from EIA-861, applied statewide. For Pawnee, the per-utility spread is 3 of 6 serving utilities: 4.5 to 7.2¢/kWh, which qualifies but never replaces the state average.
Pawnee, Nebraska has nothing in the interconnection queue across the feeds covered here, quiet or uningested. For Pawnee, Nebraska, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Pawnee shows 871.526 lb CO2 per MWh.
For Pawnee, the USGS 2015 compilation records 3.97 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Pawnee sits within commuting range of roughly 27,197 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Pawnee here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Pawnee, Nebraska settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Pawnee, Nebraska requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Pawnee, Nebraska are logged directly below, so each figure on this page can be traced back to its public dataset.