Power by county

Saline, NE: data center power outlook

The grid around Saline, Nebraska is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Saline the mapped layer shows 10 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Saline is split among 7 utilities, among them CITY OF CRETE, CITY OF FRIEND - (NE), CITY OF WILBER.

Grid position at a glance

Serving utilities
CITY OF CRETE, CITY OF FRIEND - (NE), CITY OF WILBER, NORRIS PUBLIC POWER DISTRICT, PERENNIAL PUBLIC POWER DIST, VILLAGE OF DE WITT - (NE), VILLAGE OF DORCHESTER - (NE)
ISO / market
SPP (Southwest Power Pool)
Highest grid access
345 kV
Substations in county
10
Industrial retail rate
8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 7 serving utilities: 7.2 to 7.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
73 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
46,811 employed in construction within ~120 km (25 of 28 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Saline

Read on for the public power picture of Saline in Nebraska, assembled for data center siting. At 345 kV, Saline carries high-voltage transmission at its strongest mapped point. Saline contains 10 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Saline clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Saline carries the state industrial average retail rate of 8.0 cents per kWh from EIA-861, applied statewide. For Saline, the per-utility spread is 2 of 7 serving utilities: 7.2 to 7.6¢/kWh, which qualifies but never replaces the state average.

Saline, Nebraska shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. No generation is filed as planned or under construction in Saline, Nebraska in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Saline shows 871.526 lb CO2 per MWh.

For Saline, the USGS 2015 compilation records 72.99 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Saline sits within commuting range of roughly 46,811 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Saline here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Saline, Nebraska settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Saline, Nebraska requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Saline, Nebraska are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources