Power by county

Churchill, NV: data center power outlook

Churchill, Nevada is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Churchill carries 5 mapped substations within its boundary, and the highest reachable grid access is 1,000 kV. Service in Churchill spans 2 utilities, with CITY OF FALLON - (NV), SIERRA PACIFIC POWER CO among those mapped.

Grid position at a glance

Serving utilities
CITY OF FALLON - (NV), SIERRA PACIFIC POWER CO
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
1000 kV
Substations in county
5
Industrial retail rate
8.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 2 serving utilities: 4.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
800 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
705 lb CO2/MWh
Water withdrawals
169 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
2,741 employed in construction within ~120 km (4 of 5 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Churchill

What follows is a screening-grade read of Churchill, Nevada, built only from named public datasets. Grid access in Churchill extends to 1,000 kV, the extra-high-voltage class. Only 5 substations is mapped in Churchill, Nevada, keeping interconnection points few.

Churchill, Nevada is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Churchill, the rate shown is the state industrial average of 8.1 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Churchill that report an industrial rate span 1 of 2 serving utilities: 4.9¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Churchill, Nevada in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M records 800 MW planned or under construction for Churchill. Churchill sits under a balancing authority that eGRID puts at 704.866 lb CO2 per MWh.

Churchill withdrew 169.08 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 2,741 people are employed in construction within a 120 km commute of Churchill (BLS QCEW), which frames staffing distance rather than free labour.

For Churchill, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Churchill, Nevada describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Churchill, Nevada, a specific address needs its own interconnection study, which this page does not attempt. The figures for Churchill, Nevada refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources