Power by county

Eureka, NV: data center power outlook

The grid around Eureka, Nevada is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Eureka the mapped layer shows 10 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Eureka is split among 3 utilities, among them MT WHEELER POWER, INC, SIERRA PACIFIC POWER CO, WELLS RURAL ELECTRIC CO.

Grid position at a glance

Serving utilities
MT WHEELER POWER, INC, SIERRA PACIFIC POWER CO, WELLS RURAL ELECTRIC CO
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
345 kV
Substations in county
10
Industrial retail rate
8.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 serving utilities: 4.9 to 7.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
705 lb CO2/MWh
Water withdrawals
201 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
20 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Eureka

The sections below set out what public data shows about siting a large electrical load in Eureka, Nevada. At 345 kV, Eureka carries high-voltage transmission at its strongest mapped point. Eureka contains 10 mapped substations, a moderate footprint spread across the service area.

There is no organized wholesale market over Eureka, Nevada; arrangements run through the serving utility instead. Eureka carries the state industrial average retail rate of 8.1 cents per kWh from EIA-861, applied statewide. For Eureka, the per-utility spread is 3 serving utilities: 4.9 to 7.0¢/kWh, which qualifies but never replaces the state average.

Eureka, Nevada has nothing in the interconnection queue across the feeds covered here, quiet or uningested. The federal EIA-860M inventory files no planned or under-construction generation in Eureka, Nevada, a real zero rather than a gap. In eGRID, the balancing authority over Eureka shows 704.866 lb CO2 per MWh.

For Eureka, the USGS 2015 compilation records 200.87 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Eureka sits within commuting range of roughly 20 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Eureka here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Eureka, Nevada settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Eureka, Nevada requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Eureka, Nevada are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources