Power by county
Humboldt, NV: data center power outlook
For Humboldt, Nevada, the public grid picture begins with its place in an area outside an organized wholesale market and the infrastructure mapped inside the county. Grid access across Humboldt tops out at 345 kV, over a footprint of 11 mapped substations. In Humboldt, 3 utilities share the retail territory, among them HARNEY ELECTRIC COOP, INC, SIERRA PACIFIC POWER CO, SURPRISE VALLEY ELECTRIFICATION.
Grid position at a glance
- Serving utilities
- HARNEY ELECTRIC COOP, INC, SIERRA PACIFIC POWER CO, SURPRISE VALLEY ELECTRIFICATION
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 345 kV
- Substations in county
- 11
- Industrial retail rate
- 8.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 3 serving utilities: 4.9 to 36.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 212 lb CO2/MWh
- Water withdrawals
- 467 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 237 employed in construction within ~120 km (1 of 2 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Humboldt
This page gathers the public grid evidence for Humboldt, Nevada that bears on a large new load. The highest mapped voltage in Humboldt is 345 kV, in the high-voltage transmission class. Humboldt carries 11 substations in the mapped layer, spread across the county.
There is no organized wholesale market over Humboldt, Nevada; arrangements run through the serving utility instead. The state industrial average retail rate is 8.1 cents per kWh, drawn from EIA-861 and applied to Humboldt at the state level rather than as a county rate. The serving utilities in Humboldt that publish a rate range 2 of 3 serving utilities: 4.9 to 36.3¢/kWh, a spread kept separate from the state average.
For Humboldt, Nevada, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Humboldt, Nevada in the federal EIA-860M inventory, a measured zero rather than missing data. Grid carbon intensity for Humboldt, via its balancing authority, is 212.458 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Humboldt at 467.22 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Humboldt, about 237 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Humboldt figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Humboldt, Nevada qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Humboldt, Nevada turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Humboldt, Nevada traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.