Power by county
Merrimack, NH: data center power outlook
Merrimack sits in the ISONE market (ISO New England); what follows is the screening-grade grid picture for Merrimack, New Hampshire, drawn from public datasets. Counting from the mapped infrastructure, Merrimack holds 14 mapped substations and reaches 450 kV. Merrimack is covered by 5 retail service territories, including LIBERTY UTILITIES (GRANITE STATE ELECTRI, NEW HAMPSHIRE ELEC COOP INC, NEW HAMPTON VILLAGE PRECINCT.
Grid position at a glance
- Serving utilities
- LIBERTY UTILITIES (GRANITE STATE ELECTRI, NEW HAMPSHIRE ELEC COOP INC, NEW HAMPTON VILLAGE PRECINCT, PUBLIC SERVICE CO OF NH, UNITIL ENERGY SYSTEMS
- ISO / market
- ISONE (ISO New England)
- Highest grid access
- 450 kV
- Substations in county
- 14
- Industrial retail rate
- 16.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 7.3 to 10.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 541 lb CO2/MWh
- Water withdrawals
- 88 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 146,834 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Merrimack
Below, Merrimack in New Hampshire is described from public data as a starting point for siting diligence. Merrimack reaches 450 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 14 substations mapped, Merrimack has a moderate spread of interconnection points.
Merrimack falls inside the ISONE market (ISO New England), which governs how its interconnection requests and capacity move. The rate for Merrimack is the 16.9 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Merrimack, reported per-utility industrial rates cover 4 of 5 serving utilities: 7.3 to 10.4¢/kWh, offered only as context beneath the state figure.
No interconnection-queue project is on record for Merrimack, New Hampshire in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Merrimack, New Hampshire has no EIA-860M generation on file, which reads as zero rather than as a gap. The balancing authority covering Merrimack carries a grid carbon intensity of 541.365 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Merrimack are 87.53 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Merrimack, some 146,834 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Merrimack are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Merrimack, New Hampshire together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Merrimack, New Hampshire is an address-level interconnection study; the county figures here only narrow where to look. For Merrimack, New Hampshire, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.