Power by county
Strafford, NH: data center power outlook
Strafford sits in the ISONE market (ISO New England); what follows is the screening-grade grid picture for Strafford, New Hampshire, drawn from public datasets. Counting from the mapped infrastructure, Strafford holds 13 mapped substations and reaches 345 kV. Strafford is covered by 5 retail service territories, including CENTRAL MAINE POWER CO, LIBERTY UTILITIES (GRANITE STATE ELECTRI, NEW HAMPSHIRE ELEC COOP INC.
Grid position at a glance
- Serving utilities
- CENTRAL MAINE POWER CO, LIBERTY UTILITIES (GRANITE STATE ELECTRI, NEW HAMPSHIRE ELEC COOP INC, PUBLIC SERVICE CO OF NH, UNITIL ENERGY SYSTEMS
- ISO / market
- ISONE (ISO New England)
- Highest grid access
- 345 kV
- Substations in county
- 13
- Industrial retail rate
- 16.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 7.3 to 10.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 20 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 541 lb CO2/MWh
- Water withdrawals
- 18 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 126,400 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Strafford
Everything here about Strafford, New Hampshire comes from public federal and state records, with the gaps left visible. Strafford reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 13 substations mapped, Strafford has a moderate spread of interconnection points.
Strafford falls inside the ISONE market (ISO New England), which governs how its interconnection requests and capacity move. The rate for Strafford is the 16.9 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Strafford, reported per-utility industrial rates cover 4 of 5 serving utilities: 7.3 to 10.4¢/kWh, offered only as context beneath the state figure.
The covered queue feeds list nothing for Strafford, New Hampshire, which may be quiet or simply uningested. Strafford has 20 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Strafford carries a grid carbon intensity of 541.365 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Strafford are 17.56 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Strafford, some 126,400 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Strafford are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Strafford, New Hampshire together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Strafford, New Hampshire is an address-level interconnection study; the county figures here only narrow where to look. For Strafford, New Hampshire, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.