Sullivan, NH: data center power outlook
Sullivan, New Hampshire is served through the ISONE market (ISO New England), and the figures below describe the public grid around a prospective data center site there. Sullivan carries 8 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Sullivan spans 4 utilities, with GREEN MOUNTAIN POWER CORP, LIBERTY UTILITIES (GRANITE STATE ELECTRI, NEW HAMPSHIRE ELEC COOP INC among those mapped.
Grid position at a glance
- Serving utilities
- GREEN MOUNTAIN POWER CORP, LIBERTY UTILITIES (GRANITE STATE ELECTRI, NEW HAMPSHIRE ELEC COOP INC, PUBLIC SERVICE CO OF NH
- ISO / market
- ISONE (ISO New England)
- Highest grid access
- 115 kV
- Substations in county
- 8
- Industrial retail rate
- 16.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 4 serving utilities: 7.3 to 10.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 4 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 541 lb CO2/MWh
- Water withdrawals
- 5.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 61,406 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Sullivan
What follows is a screening-grade read of Sullivan, New Hampshire, built only from named public datasets. At 115 kV, Sullivan sits in the transmission class that a large load would look to. The mapped layer places 8 substations across Sullivan, a moderate density.
Interconnection over Sullivan runs through the ISONE market (ISO New England) and its rules. For Sullivan, the rate shown is the state industrial average of 16.9 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Sullivan that report an industrial rate span 3 of 4 serving utilities: 7.3 to 10.4¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Sullivan, New Hampshire in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M records 4 MW planned or under construction for Sullivan. Sullivan sits under a balancing authority that eGRID puts at 541.365 lb CO2 per MWh.
Sullivan withdrew 5.24 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 61,406 people are employed in construction within a 120 km commute of Sullivan (BLS QCEW), which frames staffing distance rather than free labour.
For Sullivan, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Sullivan, New Hampshire describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Sullivan, New Hampshire, a specific address needs its own interconnection study, which this page does not attempt. The figures for Sullivan, New Hampshire refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.