Power by county

Essex, NY: data center power outlook

For Essex, New York, the public grid picture begins with its place in the NYISO market (New York Independent System Operator) and the infrastructure mapped inside the county. Grid access across Essex tops out at 115 kV, over a footprint of 24 mapped substations. In Essex, 5 utilities share the retail territory, among them GREEN MOUNTAIN POWER CORP, LAKE PLACID VILLAGE, INC - (NY), NEW YORK STATE ELEC & GAS CORP.

Grid position at a glance

Serving utilities
GREEN MOUNTAIN POWER CORP, LAKE PLACID VILLAGE, INC - (NY), NEW YORK STATE ELEC & GAS CORP, NIAGARA MOHAWK POWER CORP., VERMONT ELECTRIC COOPERATIVE, INC
ISO / market
NYISO (New York Independent System Operator)
Highest grid access
115 kV
Substations in county
24
Industrial retail rate
9.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 5 serving utilities: 2.5 to 2.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
2 projects, 70 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
479 lb CO2/MWh
Water withdrawals
23 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
24,759 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Essex

For Essex, New York, the following sections turn public grid records into a siting-oriented summary. The strongest mapped access in Essex is 115 kV, squarely transmission class. Essex carries 24 substations, a dense footprint across the county.

For Essex, the NYISO market (New York Independent System Operator) is the operator that handles interconnection and capacity. The state industrial average retail rate is 9.6 cents per kWh, drawn from EIA-861 and applied to Essex at the state level rather than as a county rate. The serving utilities in Essex that publish a rate range 2 of 5 serving utilities: 2.5 to 2.7¢/kWh, a spread kept separate from the state average.

On record for Essex are 2 interconnection-queue projects, totalling 70 MW of requested capacity. No generation is filed as planned or under construction in Essex, New York in the federal EIA-860M inventory, a measured zero rather than missing data. Grid carbon intensity for Essex, via its balancing authority, is 479.212 lb CO2 per MWh in eGRID.

USGS 2015 puts freshwater withdrawals across Essex at 23.13 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Essex, about 24,759 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.

Read the Essex figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Essex, New York qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Essex, New York turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Essex, New York traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.

Sources