Jefferson, NY: data center power outlook

Jefferson, New York is served through the NYISO market (New York Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Jefferson carries 47 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Jefferson spans 3 utilities, with NIAGARA MOHAWK POWER CORP., VILLAGE OF PHILADELPHIA - (NY), VILLAGE OF THERESA - (NY) among those mapped.

Grid position at a glance

Serving utilities
NIAGARA MOHAWK POWER CORP., VILLAGE OF PHILADELPHIA - (NY), VILLAGE OF THERESA - (NY)
ISO / market
NYISO (New York Independent System Operator)
Highest grid access
115 kV
Substations in county
47
Industrial retail rate
9.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 3 serving utilities: 2.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
6 projects, 529 MW
Proposed generation
219 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
479 lb CO2/MWh
Water withdrawals
22 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
19,387 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Jefferson

The material below frames Jefferson, New York for a prospective large load, drawing only on public sources. At 115 kV, Jefferson sits in the transmission class that a large load would look to. The mapped layer packs 47 substations into Jefferson, a dense spread of options.

Interconnection over Jefferson runs through the NYISO market (New York Independent System Operator) and its rules. For Jefferson, the rate shown is the state industrial average of 9.6 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Jefferson that report an industrial rate span 1 of 3 serving utilities: 2.7¢/kWh, shown as context and never as the county rate.

The queue feeds show 6 projects for Jefferson, totalling 529 MW of requested capacity. EIA-860M records 219 MW planned or under construction for Jefferson. Jefferson sits under a balancing authority that eGRID puts at 479.212 lb CO2 per MWh.

Jefferson withdrew 22.06 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 19,387 people are employed in construction within a 120 km commute of Jefferson (BLS QCEW), which frames staffing distance rather than free labour.

For Jefferson, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Jefferson, New York describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Jefferson, New York, a specific address needs its own interconnection study, which this page does not attempt. The figures for Jefferson, New York refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.