Power by county
Suffolk, NY: data center power outlook
The grid around Suffolk, New York is summarized here from public data, starting from the county's position in the NYISO market (New York Independent System Operator). Inside Suffolk the mapped layer shows 135 mapped substations, with grid access reaching 138 kV at its strongest point. Retail service across Suffolk is split among 3 utilities, among them FISHERS ISLAND UTILITY CO INC, LONG ISLAND POWER AUTHORITY, VILLAGE OF GREENPORT - (NY).
Grid position at a glance
- Serving utilities
- FISHERS ISLAND UTILITY CO INC, LONG ISLAND POWER AUTHORITY, VILLAGE OF GREENPORT - (NY)
- ISO / market
- NYISO (New York Independent System Operator)
- Highest grid access
- 138 kV
- Substations in county
- 135
- Industrial retail rate
- 9.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- No per-utility rate on fileLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 21 projects, 2,536 MW
- Proposed generation
- 195 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 479 lb CO2/MWh
- Water withdrawals
- 266 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 377,591 employed in construction within ~120 km (23 of 24 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Suffolk
Read on for the public power picture of Suffolk in New York, assembled for data center siting. Transmission-class access reaches 138 kV in Suffolk at its strongest mapped point. Suffolk contains 135 mapped substations, a dense footprint that spreads interconnection options across many points.
Wholesale activity over Suffolk clears through the NYISO market (New York Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Suffolk carries the state industrial average retail rate of 9.6 cents per kWh from EIA-861, applied statewide.
Suffolk carries 21 projects in the interconnection queue, totalling 2,536 MW of requested capacity. In Suffolk, 195.3 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Suffolk shows 479.212 lb CO2 per MWh.
For Suffolk, the USGS 2015 compilation records 265.65 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Suffolk sits within commuting range of roughly 377,591 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Suffolk here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Suffolk, New York settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Suffolk, New York requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Suffolk, New York are logged directly below, so each figure on this page can be traced back to its public dataset.