Power by county
Craven, NC: data center power outlook
The grid around Craven, North Carolina is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Craven the mapped layer shows 27 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Craven is split among 5 utilities, among them CARTERET-CRAVEN EL MEMBER CORP, CITY OF NEW BERN - (NC), DUKE ENERGY PROGRESS - (NC).
Grid position at a glance
- Serving utilities
- CARTERET-CRAVEN EL MEMBER CORP, CITY OF NEW BERN - (NC), DUKE ENERGY PROGRESS - (NC), JONES-ONSLOW ELEC MEMBER CORP, TIDELAND ELECTRIC MEMBER CORP
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 230 kV
- Substations in county
- 27
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 7.9 to 8.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 482 lb CO2/MWh
- Water withdrawals
- 31 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 23,182 employed in construction within ~120 km (19 of 20 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Craven
The sections below set out what public data shows about siting a large electrical load in Craven, North Carolina. Transmission-class access reaches 230 kV in Craven at its strongest mapped point. Craven contains 27 mapped substations, a dense footprint that spreads interconnection options across many points.
Wholesale activity over Craven clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Craven carries the state industrial average retail rate of 7.8 cents per kWh from EIA-861, applied statewide. For Craven, the per-utility spread is 4 of 5 serving utilities: 7.9 to 8.9¢/kWh, which qualifies but never replaces the state average.
For Craven, North Carolina, no queued project appears in the feeds currently covered. The federal EIA-860M inventory files no planned or under-construction generation in Craven, North Carolina, a real zero rather than a gap. In eGRID, the balancing authority over Craven shows 481.506 lb CO2 per MWh.
For Craven, the USGS 2015 compilation records 30.99 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Craven sits within commuting range of roughly 23,182 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Craven here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Craven, North Carolina settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Craven, North Carolina requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Craven, North Carolina are logged directly below, so each figure on this page can be traced back to its public dataset.