Power by county
Iredell, NC: data center power outlook
Iredell sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Iredell, North Carolina, drawn from public datasets. Counting from the mapped infrastructure, Iredell holds 78 mapped substations and reaches 500 kV. Iredell is covered by 3 retail service territories, including CITY OF STATESVILLE - (NC), DUKE ENERGY CAROLINAS, LLC, ENERGYUNITED ELEC MEMBER CORP.
Grid position at a glance
- Serving utilities
- CITY OF STATESVILLE - (NC), DUKE ENERGY CAROLINAS, LLC, ENERGYUNITED ELEC MEMBER CORP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 78
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 serving utilities: 5.8 to 8.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 10 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 485 lb CO2/MWh
- Water withdrawals
- 23 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 130,633 employed in construction within ~120 km (38 of 39 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Iredell
Below, Iredell in North Carolina is described from public data as a starting point for siting diligence. Iredell reaches 500 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 78 substations mapped, Iredell offers interconnection points across many locations.
Sitting outside any organized market, Iredell, North Carolina handles interconnection through its utility rather than a central operator. The rate for Iredell is the 7.8 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Iredell, reported per-utility industrial rates cover 3 serving utilities: 5.8 to 8.7¢/kWh, offered only as context beneath the state figure.
No interconnection-queue project is on record for Iredell, North Carolina in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Iredell has 10 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Iredell carries a grid carbon intensity of 484.617 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Iredell are 22.75 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Iredell, some 130,633 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Iredell are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Iredell, North Carolina together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Iredell, North Carolina is an address-level interconnection study; the county figures here only narrow where to look. For Iredell, North Carolina, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.