Power by county
Mitchell, NC: data center power outlook
Mitchell, North Carolina is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Mitchell carries 2 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Mitchell spans 5 utilities, with DUKE ENERGY CAROLINAS, LLC, DUKE ENERGY PROGRESS - (NC), FRENCH BROAD ELEC MEMBER CORP among those mapped.
Grid position at a glance
- Serving utilities
- DUKE ENERGY CAROLINAS, LLC, DUKE ENERGY PROGRESS - (NC), FRENCH BROAD ELEC MEMBER CORP, MOUNTAIN ELECTRIC COOP, INC, RUTHERFORD ELEC MEMBER CORP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 230 kV
- Substations in county
- 2
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 7.8 to 8.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 0 lb CO2/MWh
- Water withdrawals
- 3.0 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 52,210 employed in construction within ~120 km (39 of 42 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Mitchell
What follows is a screening-grade read of Mitchell, North Carolina, built only from named public datasets. At 230 kV, Mitchell sits in the transmission class that a large load would look to. Only 2 substations is mapped in Mitchell, North Carolina, keeping interconnection points few.
Mitchell, North Carolina is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Mitchell, the rate shown is the state industrial average of 7.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Mitchell that report an industrial rate span 4 of 5 serving utilities: 7.8 to 8.3¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Mitchell, North Carolina carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Mitchell, North Carolina in EIA-860M as planned or under construction, which counts as a measured zero. Mitchell sits under a balancing authority that eGRID puts at 0 lb CO2 per MWh.
Mitchell withdrew 3.01 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 52,210 people are employed in construction within a 120 km commute of Mitchell (BLS QCEW), which frames staffing distance rather than free labour.
For Mitchell, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Mitchell, North Carolina describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Mitchell, North Carolina, a specific address needs its own interconnection study, which this page does not attempt. The figures for Mitchell, North Carolina refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.