Power by county
Stokes, NC: data center power outlook
Stokes, North Carolina is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Stokes carries 25 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Stokes spans 4 utilities, with APPALACHIAN POWER CO, DUKE ENERGY CAROLINAS, LLC, ENERGYUNITED ELEC MEMBER CORP among those mapped.
Grid position at a glance
- Serving utilities
- APPALACHIAN POWER CO, DUKE ENERGY CAROLINAS, LLC, ENERGYUNITED ELEC MEMBER CORP, SURRY-YADKIN ELEC MEMBER CORP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 230 kV
- Substations in county
- 25
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 4 serving utilities: 5.8 to 14.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 35 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 485 lb CO2/MWh
- Water withdrawals
- 1,269 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 78,543 employed in construction within ~120 km (36 of 43 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Stokes
The material below frames Stokes, North Carolina for a prospective large load, drawing only on public sources. At 230 kV, Stokes sits in the transmission class that a large load would look to. The mapped layer packs 25 substations into Stokes, a dense spread of options.
Because Stokes, North Carolina sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. For Stokes, the rate shown is the state industrial average of 7.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Stokes that report an industrial rate span 3 of 4 serving utilities: 5.8 to 14.1¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Stokes, North Carolina in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M records 34.5 MW planned or under construction for Stokes. Stokes sits under a balancing authority that eGRID puts at 484.617 lb CO2 per MWh.
Stokes withdrew 1,269.47 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 78,543 people are employed in construction within a 120 km commute of Stokes (BLS QCEW), which frames staffing distance rather than free labour.
For Stokes, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Stokes, North Carolina describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Stokes, North Carolina, a specific address needs its own interconnection study, which this page does not attempt. The figures for Stokes, North Carolina refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.