Power by county
Steele, ND: data center power outlook
For Steele, North Dakota, the public grid picture begins with its place in the MISO market (Midcontinent Independent System Operator) and the infrastructure mapped inside the county. Grid access across Steele tops out at 345 kV, over a footprint of 14 mapped substations. In Steele, 6 utilities share the retail territory, among them CASS COUNTY ELEC COOP INC, CITY OF SHARON- (ND), NODAK ELECTRIC COOP INC.
Grid position at a glance
- Serving utilities
- CASS COUNTY ELEC COOP INC, CITY OF SHARON- (ND), NODAK ELECTRIC COOP INC, NORTHERN STATES POWER CO - MINNESOTA, OTTER TAIL POWER CO, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 345 kV
- Substations in county
- 14
- Industrial retail rate
- 7.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 6 serving utilities: 1.1 to 10.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 2 projects, 700 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 2.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 16,810 employed in construction within ~120 km (15 of 16 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Steele
This page gathers the public grid evidence for Steele, North Dakota that bears on a large new load. The highest mapped voltage in Steele is 345 kV, in the high-voltage transmission class. Steele carries 14 substations in the mapped layer, spread across the county.
For Steele, the MISO market (Midcontinent Independent System Operator) is the operator that handles interconnection and capacity. The state industrial average retail rate is 7.5 cents per kWh, drawn from EIA-861 and applied to Steele at the state level rather than as a county rate. The serving utilities in Steele that publish a rate range 5 of 6 serving utilities: 1.1 to 10.4¢/kWh, a spread kept separate from the state average.
On record for Steele are 2 interconnection-queue projects, totalling 700 MW of requested capacity. For Steele, North Dakota, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. Grid carbon intensity for Steele, via its balancing authority, is 981.982 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Steele at 2.19 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Steele, about 16,810 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Steele figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Steele, North Dakota qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Steele, North Dakota turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Steele, North Dakota traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.