Belmont, OH: data center power outlook
Belmont, Ohio is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Belmont carries 49 mapped substations within its boundary, and the highest reachable grid access is 765 kV. Service in Belmont spans 6 utilities, with APPALACHIAN POWER CO, CITY OF ST CLAIRSVILLE - (OH), GUERNSEY-MUSKINGUM EL COOP INC among those mapped.
Grid position at a glance
- Serving utilities
- APPALACHIAN POWER CO, CITY OF ST CLAIRSVILLE - (OH), GUERNSEY-MUSKINGUM EL COOP INC, OHIO POWER CO, SOUTH CENTRAL POWER COMPANY, WHEELING POWER CO
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 765 kV
- Substations in county
- 49
- Industrial retail rate
- 8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 6 serving utilities: 2.6 to 14.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 12 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 84,354 employed in construction within ~120 km (38 of 39 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Belmont
The material below frames Belmont, Ohio for a prospective large load, drawing only on public sources. Grid access in Belmont extends to 765 kV, the extra-high-voltage class. The mapped layer packs 49 substations into Belmont, a dense spread of options.
Interconnection over Belmont runs through the PJM market (PJM Interconnection) and its rules. For Belmont, the rate shown is the state industrial average of 8.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Belmont that report an industrial rate span 3 of 6 serving utilities: 2.6 to 14.2¢/kWh, shown as context and never as the county rate.
The covered queue feeds list nothing for Belmont, Ohio, which may be quiet or simply uningested. Belmont, Ohio has no EIA-860M generation on file, which reads as zero rather than as a gap. Belmont sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.
Belmont withdrew 11.55 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 84,354 people are employed in construction within a 120 km commute of Belmont (BLS QCEW), which frames staffing distance rather than free labour.
For Belmont, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Belmont, Ohio describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Belmont, Ohio, a specific address needs its own interconnection study, which this page does not attempt. The figures for Belmont, Ohio refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.