Power by county

Clinton, OH: data center power outlook

For Clinton, Ohio, the public grid picture begins with its place in the PJM market (PJM Interconnection) and the infrastructure mapped inside the county. Grid access across Clinton tops out at 345 kV, over a footprint of 13 mapped substations. In Clinton, 5 utilities share the retail territory, among them DAYTON POWER & LIGHT CO, DUKE ENERGY OHIO INC, OHIO POWER CO.

Grid position at a glance

Serving utilities
DAYTON POWER & LIGHT CO, DUKE ENERGY OHIO INC, OHIO POWER CO, SOUTH CENTRAL POWER COMPANY, VILLAGE OF BLANCHESTER - (OH)
ISO / market
PJM (PJM Interconnection)
Highest grid access
345 kV
Substations in county
13
Industrial retail rate
8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 5 serving utilities: 1.8 to 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
300 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
3.0 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
122,772 employed in construction within ~120 km (41 of 48 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Clinton

For Clinton, Ohio, the following sections turn public grid records into a siting-oriented summary. The highest mapped voltage in Clinton is 345 kV, in the high-voltage transmission class. Clinton carries 13 substations in the mapped layer, spread across the county.

For Clinton, the PJM market (PJM Interconnection) is the operator that handles interconnection and capacity. The state industrial average retail rate is 8.5 cents per kWh, drawn from EIA-861 and applied to Clinton at the state level rather than as a county rate. The serving utilities in Clinton that publish a rate range 4 of 5 serving utilities: 1.8 to 10.8¢/kWh, a spread kept separate from the state average.

Clinton, Ohio shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. Federal filings (EIA-860M) list 300 MW of generation as planned or under construction in Clinton. Grid carbon intensity for Clinton, via its balancing authority, is 716.09 lb CO2 per MWh in eGRID.

USGS 2015 puts freshwater withdrawals across Clinton at 2.97 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Clinton, about 122,772 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.

Read the Clinton figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Clinton, Ohio qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Clinton, Ohio turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Clinton, Ohio traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.